- Cast & Forged[90]
- Other Tools[31]
- Instrument Parts & Accessories[1]
- Other Measuring & Gauging Tools[44]
- Tile Making Machinery[32]
- Wrench[96]
- Metal Forging Machinery[32]
- Hammer[32]
- Pliers[32]
- Educational Toys[18]
- Testing Equipment[10]
- Tool Parts[4]
- Used Embroidery Machines[1]
- Other Hand Tools[10]
- Chisel[1]
- Metal Processing Machinery Parts[2]
- Other Metallurgy Machinery[1]
- Boiler Parts[4]
- Industrial Furnace[5]
- Other Metals & Metal Products[1]
- Other Machine Tools[2]
- Other Petrochemical Related Products[3]
- Hand Tool Sets[10]
- Axe[10]
- Other Tool Sets[1]
- Contact Person : Mr. Wang Chengzhi
- Company Name : Cangzhou Zhongbo Heavy Industry Machinery & Equipment Co., Ltd.
- Tel : 86-0317-8308880
- Fax : 86-0317-8181444
- Address : Hebei,cangzhou,Fuzhuang Development Area, Botou, Hebei,China
- Country/Region : China
- Zip : 062150
Tool Set for Electrical Distribution Facilities, 19PCS (41004)
No. | Spec | Qty |
01 | Electrician Nested Belt | 1 |
02 | Safety Belt | 1 |
03 | High-voltage Insulated Gloves 12000V | 1 |
04 | Clip-on Ammeter | 1 |
05 | Electric Soldering Iron 500W | 1 |
06 | Tinol | 1 |
07 | Electrician' s Knife | 1 |
08 | Insulating Tape | 1 |
09 | Universal Electric Meter VC9801A+ | 1 |
10 | Three Gear Puller 200mm | 1 |
11 | Insulated Bar 25*200mm | 1 |
12 | Soldering Tin Bar | 1 |
13 | Slotted Screwdriver150mm | 2 |
14 | Adjustable Wrench 250mm | 1 |
15 | Electroprobe | 1 |
16 | Long Nose Pliers 150mm | 1 |
17 | Lineman Pliers 200mm | 1 |
18 | Drawing Pliers | 1 |
1. Material: Aluminum bronz and beryllium copper alloy 2. Rockwell hardnessAl-bronze (HRC≥ 25° B>75-85kgf/mm² )Be-bronze (HRC≥ 35° B>105-120kgf/mm² )
3. Application fieldIn the normal process of using aluminum-copper alloys are more applicable to conditions of pressure equipment and explosion-proof environments with less stringent requirements (such as gas stations, small oil depots, etc. ). The beryllium copper alloy explosion-proof tool for refineries to switch gas stations, gas production plants, drilling crew and so on. 4. The processing procedureStep1) To prepare the raw material, blankingStep2) SmeltingStep3) PouringStep4) Cut the water gapStep5) Stored in the semi finished products warehouseStep6) PunchingStep7) Through the drawbench or slotting machineStep8) PE plain end and chamferingStep9) Drill holeStep10) Perfect the product and markingStep11) If Be-bronze, need heat treatmentStep12) PolishingStep13) Surface treatment
Tool Set for Electrical Distribution Facilities, 19PCS (41004)